138
            
            
              139
            
            
              
                Technical Information
              
            
            
              
                Scoring process
              
            
            
              Evaluation framework
            
            
              •The evaluation framework defines the hierarchical structure of the assessment methodology.
            
            
              •It is composed of 6 main categories:
            
            
              •Each category is composed of several indicators assessing different key issues for the sustain-
            
            
              ability performance of the project.
            
            
              •Each indicator consists in one or several sub-indicators that evaluate a precise issue covered by
            
            
              the indicator topic.
            
            
              The scoring process describes the way points are calculated, from the evaluation of each subin-
            
            
              dicator to the global performance of the building.
            
            
              • Fulfilling requirements set by sub-indicators awards a certain amount of points ranging from 0 to
            
            
              100 depending on the performance met. Each sub-indicator is weighted from 0 to 4, with 0 meaning
            
            
              the sub-indicator is irrelevant, and 4 it is of high importance.
            
            
              •The score for each indicator is the weighted average of the points awarded for the subindicators.
            
            
              Each indicator is weighted from 0 to 4, and the score achieved for each category is the weighted
            
            
              average of the points awarded for the indicators.
            
            
              • The final building performance is obtained by calculating the average of the environmental,
            
            
              social and economic category scores. (Environmental, social and economic categories are equally
            
            
              weighted)
            
            
              • The three other categories are •evaluated separately.
            
            
              
                Building Life Cycle Phases according to FprEN 15978, adapted
              
            
            
              
                
                  доклади
                
              
            
            
              
                
                  доклади